|
Above: Delivering two ex-Southern Region ‘TC’ carriages from Meldon Quarry (near Exeter) to Bellingham Heritage Centre (north of Newcastle). Upon delivery at Bellingham, the coaches were ‘tipped’ onto a temporary track panel (installed by Moveright) which then allowed the coaches to be jacked laterally into position utilising our MFD lifting gear.
|